工程造价是指对整个工程进行预测、计划、控制、核算、分析和评价等过程。工程造价毕业设计写作中的摘要是第一步,不少有同学在写作时可能会遇到困难,下面我们就为大家简单介绍一下工程造价毕业设计摘要范文,大家可以参考借鉴一下。
一、工程造价毕业设计摘要
范文一
清单计价模式在世界上有很广泛的运用, 在我国也正在取代定额计价模式成为主流,中国的政策法规规定, 凡使用国有资金投资的工程项目必须采用清单计价模式,其他情况下的工程项目具体是使用清单模式还是定额模式由建设单位自行决定。保留定额计价是考虑到我国实际情况而作出的一种过渡性安排。
本毕业设计通过西部小街运河家园 15#楼的工程为实例, 进行了工程计量计价。使用未来清单编制软件、 Excel、天正建筑等软件,结合学习的知识及中国现阶段的计价模式, 通过定额与清单模式的编制、 成果对比,熟悉了招标控制价、投标报价的编制过程,深化了对造价工作的认识与运用。
关键词: 清单计价,定额计价,招标,投标,成本管理
Bill valuation mode is used very widely in the world, in China is also being replaced by the tradition mode of rating valuation to become the popularity, according to China's policies and regulations, investment and the use of state capital projects must adopt the mode of valuation with bill, other project case specific is the use of list mode or quota mode is decided by the construction unit itself. Reserved quota valuation is a transitional arrangement in consideration of China's actual situation and make.
The graduation design through the Western Street Canal homes 15# building project as an example, the engineering valuation. The use of future listed software, Excel, TarchCAD building software, combined with the pricing mode of learning knowledge and the present stage of China, by contrast, quota and compiled list mode results, familiar with the process for the preparation of tender control price, bidding, deepen the understanding and application of the cost of work.
Keywords: bill valuation, quota valuation, invitation for bid, bidding, Cost management
范文二
建设工程工程量清单是表现建设工程的分部分项工程项目、措施项目、其他项目名称及相应清单,应由具有编制能力和评标能力的招标人或招标代理人,具有相应资质的工程造价咨询人按照统一的工程量计算规则、统一的项目编码、统一的项目名称、统一的计量单位进行编制。这些表包括分部分项工程量清单、措施项目清单、其他项目清单、规费项目清单和税金项目清单。
为了适应工程管理和经济核算的需要,将一个建设项目分解为单项工程、单位工程、分部工程和分项工程。分部分项工程量清单应采用综合单价计价;措施项目清单计价应根据拟建工程的施工组织设计,可以计算工程量的措施项目,应按分部分项工程量清单的方式采用综合单价计价;其余的措施项目可以"项"为单位的方式计价,应包括除规费、税金外的全部费用;其他项目清单中:暂列金额由招标人在其他项目清单中列出,材料暂估价由招标人在其他项目清单中列出,专业工程暂估价由招标人在其他项目清单中列出,计。
日工由招标人在其他项目清单中列出的项目和数量,投标人自主确定综合单价并计算计日工费用,总承包服务费根据招标文件中列出的内容和提出的要求自主确定;规费和税金应按国家或省级、行业建设主管部门的规定计算。综合单价是指为完成一一个规定计量单位分部分项工程单项目所需的多种费用合计。
[关键词]工程量清单,分部分项工程量清单,综合单价
Construction projects resilience the performance of the sub-part of the project, measures the project, other project name and the corresponding list of number of details,Quantities should be prepared with the capacity or by the tender commission, with the corresponding project cost qualified consultants in accordance with the unified rules of calculation work, unity of the project code name of the project a unified, unified for the preparation of units of measurement. These tables include a list of some of the volume of projects, measures to the list of items, a list of other projects, a list of fees and taxes the project list of items.
Part of the volume of sub-list of projects should be an integrated unit pricing; measures price list of items should be based on the proposed construction project designed to measure the amount of calculation works projects, the project should be part of the volume of sub-list of ways an integrated unit pricing; the rest of measures the project can be "of" the way the unit pricing, should be included in addition to fees, the full cost of foreign taxes, the list of other projects. the amount of leads from the tender in the list other items, materials provisional valuation by the tender in list of other projects, professional project occasional valuation from other items in the tender.Integrated unit to complete a required part of the sub-unit of measurement of quantities of engineering projects or measures to the list of items needed for labor, materials, construction machinery and the use of fees and management fees and profit enterprises, as well as a range of risk costs.
[Key words] The list of projects part of the volume of sub-list of projects comprehensive price
范文三
本次毕业设计题目为芦屯中心小学教学楼的招标文件、施工图预算及工程里清单三个部分,建筑面积4463.6平方米,层数为4层,层高3.9米,结构类型为框架结构。本毕业设计由招标文件的编制、施工图预算、I程里清单的编制三部分组成。
设计的任务是招标文件的编制、施工图预算和工程里清单的编制,其核心部分与首要工作是工程重的计算,在设计过程中,以《建设工程计里与计价》、《工程重清单计价与规则》为依据,按照辽宁省建筑工程工程里清单计价办法进行,经过指导老师上课的仔细讲授与个别答疑,并通过使用查阅资料与网络等手段,在指导老师的帮助下先完成了工程里的计算。
关键词:招标文件、施工图预算、工程重清单
The graduation design subject is Lutun center primary school building project cost and the construction organization design. there are 4 layers overground, the building is 16.5 meters tall and it' s construction area is 4463. 6 square meters, the structure form is frame structure. the graduation design consists of three parts which are the preparation of tender documents, construction drawing budget and the formulation of the list of quantities.
The design tasks are the preparation of tender documents, construction drawing budget and the formulation of the list of quantities, the core part and the primary work is he formulation of the list of quantities. In the design process, based on 'Construction engineering measurement and measurement 'and
The quantities bill valuation with the rules ,, according to the Liaoning Province construction engineering list valuation measures, after the teacher carefully in class teaching and inpidual answer questions, and through the use of datd access and network means, in the guidance of teacher to help complete the calculation of the quantity.
Key words: tender documents ,construction drawing budget, the list ofquantities.
这篇"工程造价毕业设计摘要(精选专业摘要3篇)"就介绍到这里,希望大家了解以上摘要写作之后,可以写出一篇优秀的毕业设计摘要。